Latest 3V0-21.21 exam dumps with real VMware questions and answers [Q17-Q37]

5/5 - (1 vote)

Latest 3V0-21.21 exam dumps with real VMware questions and answers

3V0-21.21 Exam in First Attempt Guaranteed

NO.17 Application owners require support of a Microsoft Windows Server Failover Cluster (WSFC).
Their current environment consists of the following components:
* vSphere 7.0 and vSAN 7.0
* External array supporting NFS 3.0/4.1, Server Message Block (SMB) 2.1
* 10 GbE storage connectivity for all devices
The solution architect is tasked with coming up with a solution to meet this requirement while utilizing their existing investments.
Which two recommendations could the architect make? (Choose two.)

 
 
 
 
 

NO.18 As part of a requirements gathering workshop, the customer provides the following requirements for the design of a new greenfield virtual infrastructure:
Some applications have a latency that must be less than 5 minutes.
The solution must be able to support a workload growth rate of 10% per year.
Which requirement classification is being gathered for the design documentation?

 
 
 
 

NO.19 An architect makes the design decision to install ESXi on embedded and resilient 8 GB SD cards.
What is the impact of this design decision?

 
 
 
 

NO.20 An architect is finalizing the design for a new vCenter Server High Availability deployment.
What is one thing the architect must document in the design?

 
 
 
 

NO.21 An architect is designing a new greenfield environment that will install ESXi on local disks. There is a requirement to streamline initial and future installations of ESXi hosts.
Which configuration option should the architect recommend for installing ESXi hosts to meet these requirements?

 
 
 
 

NO.22 An organization’s data scientists are executing a plan to use machine learning (ML). They must have access to graphical processing unit (GPU) capabilities to execute their computational models when needed. The solutions architect needs to design a solution to ensure that GPUs can be shared by multiple virtual machines.
Which two solutions should the architect recommend to meet these requirements? (Choose two.)

 
 
 
 
 

NO.23 A customer has six hosts available in a cluster. When running at full capacity, all virtual machines can be run on two hosts.
How many hosts can the customer place into maintenance mode at the same time while still providing N+2 resiliency to the cluster?

 
 
 
 

NO.24 An architect is creating a network design for a new vSphere environment.
Based on customer requirements, the environment must support the following types of traffic:
Management
vMotion
vSAN
Fault Tolerance
Virtual machine traffic, which cannot be impacted by other types of traffic Which design recommendation can the architect make for a resilient infrastructure with vSphere network service tiering?

 
 
 
 

NO.25 An architect is designing a new VMware solution for a customer that has a number of different resource profiles.
The following are the business requirements for the design:
The solution must support virtual machines with the following storage profiles:
– Write-intensive
– Backup
– Write-Once-Read-Many (WORM) archive
The solution must support migration of virtual machine disks between storage profiles.
The WORM archive data must be located at an isolated secure site.
The backup storage array must only be connected to a backup media server.
All data should be recoverable from backup.
Which design decision should the architect make to meet the business requirements?

 
 
 
 

NO.26 An architect is finalizing the design for a new vCenter Server High Availability deployment.
What is one thing the architect must document in the design?

 
 
 
 

NO.27 An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5,000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

 
 
 
 

NO.28 An architect is designing a new VMware software-defined data center (SDDC) that will consist of 100 branch sites connected to a single VMware vCenter Server within the primary data center. To allow for the use of existing automation scripts, there is a requirement to replicate the names of the virtual distributed port groups across all sites. The procurement team purchases licensing and there is no further budget allocated.
Which design decision should the architect make to meet this requirement?

 
 
 
 

NO.29 During a requirements gathering workshop, the customer’s Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:
All operating system critical patches must be installed within 24 hours of release.
All virtual machine templates must be updated every three months in line with company policy.
Which requirement classification is being gathered for the design documentation?

 
 
 
 

NO.30 An architect is considering placement of virtual machines within an existing VMware software-defined data center (SDDC).
During the discovery phase, the following information is documented:
Cluster One
Six ESXi hosts
vSphere HA with host failures cluster tolerates = 1
Proactive HA is enabled and set to automated
Fully Automated vSphere DRS
Transparent Page Sharing (TPS) is enabled
Cluster Two
Eight ESXi hosts
vSphere HA with host failures cluster tolerates = 1
Proactive HA is disabled
Partially Automated vSphere DRS
Transparent Page Sharing (TPS) is disabled
Cluster Three
Three ESXi hosts
vSphere HA with admission control is disabled
Proactive HA is not supported
Transparent Page Sharing (TPS) is disabled
Virtual Machine Resource Profile 1
Memory sharing techniques should not be used
Virtual machines should be automatically restarted in the event of host failure if resources are available Automated initial virtual machine placement Virtual Machine Resource Profile 2 Memory sharing techniques should not be used Virtual machines should be automatically restarted in the event of host failure regardless of available resources Automated initial virtual machine placement Which two recommendations should the architect make for placement of the virtual machines to meet resource profile requirements? (Choose two.)

 
 
 
 
 

NO.31 During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.
Which two of the listed statements are business requirements? (Choose two.)

 
 
 
 
 

NO.32 During a requirements gathering workshop, the customer’s Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:
* All operating system critical patches must be installed within 24 hours of release.
* All virtual machine templates must be updated every three months in line with company policy.
Which requirement classification is being gathered for the design documentation?

 
 
 
 

NO.33 An architect is designing a new vSphere platform to meet a list of requirements from the security team.
Which two requirements would be classified as non-functional requirements? (Choose two.)

 
 
 
 
 

NO.34 An architect is considering placement of virtual machines within an existing VMware software-defined data center (SDDC).
During the discovery phase, the following information is documented:

Which two recommendations should the architect make for placement of the virtual machines to meet resource profile requirements? (Choose two.)

 
 
 
 
 

NO.35 A new vSphere platform is being created. The platform will host virtual machines that will run management services and line-of-business applications.
What should the architect consider when designing the number and type of clusters required?

 
 
 
 

NO.36 An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.
During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:
The solution must support the concurrent running of 1,000 virtual machines The production environment must be delivered across two geographically dispersed data centers All virtual machines must be capable of running in either data center.
The two data centers are currently connected to each other through a single but diversely routed, high bandwidth and low latency link.
The link between the two data centers is capable of supporting a round-trip time (RTT) of 150 ms The existing server hardware standard document states that all virtual infrastructure hosts must be deployed using vSAN ReadyNodes The service owner has stated that it is critical to ensure the availability target of 99.9% All virtual machine backups must be completed using the existing backup service The recovery time objective (RTO) for the service is five minutes The recovery point objective (RPO) of the service is four hours Which two elements represent risks to the successful delivery of this solution? (Choose two.)

 
 
 
 
 

NO.37 During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.
Which two of the listed statements are business requirements? (Choose two.)

 
 
 
 
 

Exam Sure Pass VMware Certification with 3V0-21.21 exam questions: https://www.dumpstorrent.com/3V0-21.21-exam-dumps-torrent.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below