Use Microsoft AZ-400 Dumps To Succeed Instantly in AZ-400 Exam [Q167-Q185]

Rate this post

Use Microsoft AZ-400 Dumps To Succeed Instantly in AZ-400 Exam

Ultimate Guide to AZ-400 Dumps – Enhance Your Future Career Now

Microsoft AZ-400 certification exam is a valuable certification for professionals who want to validate their skills in designing and implementing DevOps solutions. AZ-400 exam covers a wide range of topics related to DevOps, and candidates are expected to demonstrate their knowledge of various tools and technologies used in this area. Designing and Implementing Microsoft DevOps Solutions certification is recognized globally and can help professionals advance their careers and increase their earning potential.

 

NO.167 You are defining release strategies for two applications as shown in the following table.

Which release strategy should you use for each application? To answer, drag the appropriate release strategies to the correct applications. Each release strategy may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NO.168 You are defining release strategies for two applications as shown in the following table.

Which release strategy should you use for each application? To answer, drag the appropriate release strategies to the correct applications. Each release strategy may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NO.169 You need to implement the code flow strategy for Project2 in Azure DevOps.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange in the correct order.

NO.170 You need to find and isolate shared code. The shared code will be maintained in a series of packages.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NO.171 Your company uses a Git repository in Azure Repos lo manage the source code of a web application. The master branch is protected from direct updates. Developers work on new features in the topic branches.
Because of the high volume of requested features, it is difficult to follow the history of the changes to the master branch.
You need to enforce a pull request merge strategy. The strategy must meet the following requirements:
* Consolidate commit histories
* Merge tie changes into a tingle commit
Which merge strategy should you use in the branch policy?

 
 
 
 

NO.172 You have the following Azure policy.

You assign the policy to the Tenant root group.
What is the effect of the policy?

 
 
 
 

NO.173 You are finalizing a release in GitHub.
You need to apply the following labels to the release:
* Name
* Email
* Release v3.0
* Release date
How should you complete the get command? To answer, select the appropriate options in the answer area.
NOTE:Each correct selection is worth one point.

NO.174 You manage build pipelines and deployment pipelines by using Azure DevOps.
Your company has a team of 500 developers. New members are added continually to the team.
You need to automate the management of users and licenses whenever possible.
Which task must you perform manually?

 
 
 
 

NO.175 You are implementing a package management solution for a Node.js application by using Azure Artifacts.
You need to configure the development environment to connect to the package repository. The solution must minimize the likelihood that credentials will be leaked.
Which file should you use to configure each connection? To answer, drag the appropriate files to the correct connections. Each file may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

NO.176 You need to deploy Internet Information Services (IIS) to an Azure virtual machine that runs Windows Server
2019.
How should you complete the Desired State Configuration (DSQ configuration script? To answer, drag the appropriate values to the correct locations. Each value may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NO.177 You plane to store signed images in an Azure Container Registry instance named az4009940427acr1.
You need to modify the SKU for az4009940427acr1 to support the planned images. The solution must minimize costs.
To complete this task, sign in to the Microsoft Azure portal.

NO.178 You need to recommend project metrics for dashboards in Azure DevOps.
Which chart widgets should you recommend for each metric? To answer, drag the appropriate chart widgets to the correct metrics. Each chart widget may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NO.179 You plan to create alerts that will be triggered based on the page load performance of a home page.
You have the Application Insights log query shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

NO.180 You have an Azure DevOps project that contains a build pipeline. The build pipeline uses approximately 50 open source libraries.
You need to ensure that all the open source libraries comply with your company’s licensing standards.
Which service should you use?

 
 
 
 

NO.181 You have a project in Azure DevOps named Contoso App that contains pipelines in Azure Pipelines for GitHub repositories. You need to ensure that developers receive Microsoft Teams notifications when there are failures in a pipeline of Contoso App. What should you run in Teams? To answer, select the appropriate options in the answer are a. NOTE: Each correct selection is worth one point.

NO.182 You are using the Dependency Tracker extension in a project in Azure DevOps.
You generate a risk graph for the project.
What should you use in the risk graph to identify the number of dependencies and the risk level of the project?
To answer, drag the appropriate elements to the correct data points. Each element may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NO.183 You have an Azure subscription that contains the resources shown in the following table.

Project1 produces 9pm packages that are published to Feed 1. Feed1 is consumed by multiple projects.
You need to ensure that only tested packages are available for consumption. The solution must minimize development effort.
What should you do?

 
 
 
 

NO.184 You need to deployInternet Information Services (IIS) to an Azure virtual machine that runs Windows Server 2022.
How should you complete the Desired State Configuration (DSC) configuration script? To answer, drag the appropriate values to the correct locations. Each value may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NO.185 Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
You have an approval process that contains a condition. The condition requires that releases be approved by a team leader before they are deployed.
You have a policy stating that approvals must occur within eight hours.
You discover that deployment fail if the approvals take longer than two hours.
You need to ensure that the deployments only fail if the approvals take longer than eight hours.
Solution: From Pre-deployment conditions, you modify the Time between re-evaluation of gates option.
Does this meet the goal?

 
 

Microsoft Dumps – Learn How To Deal With The Exam Anxiety: https://www.dumpstorrent.com/AZ-400-exam-dumps-torrent.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below