Q67. When deciding if you should keep a part in stock, which of the following should be yourprimaryconcern?

 
 
 
 

Q68. Which of the following tasks should be used to incorporate changes to process and equipment?
1.Use an accepted risk analysis process when a change is made
2.Use a database to record equipment failures
3.Use change procedures and policies to document changes
4.Use cross-functional teams to conduct safety, operability. and maintainability reviews

 
 
 
 

Q69. For a very stable and capable manufacturing process that is centered around the product specification, extremely low levels of detects may be identified by using:

 
 
 
 

Q70. What is a good indicator of individual job performance?

 
 
 
 

Q71. What is the responsibility of a leader?

 
 
 
 

Q72. Surveys have shown that plants (facilities) with good planning and scheduling systems and good predictive and preventive programs have which ratios of maintenance tasks? (Does not include service to operations or capital projects or turnarounds)

 
 
 
 

Q73. Which one of the following work order characteristics add the most value to the business?

 
 
 
 

Q74. In a Total Productive Maintenance (TPM) program what is autonomous maintenance?

 
 
 
 

Q75. For which of the following elements is the maintenance manager directly responsible?

 
 
 
 

Q76. Using predictive technologies, approximately what percent of failures in rotating equipment can be found?

 
 
 
 

Q77. Process measures are leading indicators that offer an indication of task performance with a lead time to manage for successful results. All of the following are examples of leading indicators except:

 
 
 
 

Q78. Who should be responsible for communicating and enforcing company policy from management to the shop-floor?

 
 
 
 

Q79. Themost effective method of performance evaluation is:

 
 
 
 

Q80. A Company produced 80.000 tons of “Good Product” last year, and the Sales department has projected a 5% increase in sales during the coming year. Production Statistics:
1.The production line operates 24 hours per day. seven days per week, except for the downtime listed below.
2.The production line downtime for maintenance averaged 108 hours per month during the past year.
3.The production line was shut down three times during the year due to power interruptions, for a total of 18 hours of downtime.
4.The production operators’ union has threatened a strike that may last as long as three weeks if it occurs.
5.The production rate is expected to stay the same as last year’s production rate.
6.Power interruption downtime is expected to stay the same as last year.
Based on the Production Statistics shown, what is the required production line availability to meet the sales projected for next year?

 
 
 
 

Q81. Which of the following methods best identifies maintenance problems caused by maintenance or operating work processes?

 
 
 
 

Q82. Why is change management essential to the implementation of a Maintenance and Reliability Program?

 
 
 
 

CMRP Exam Dumps, CMRP Practice Test Questions: https://www.dumpstorrent.com/CMRP-exam-dumps-torrent.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below