ISTQB CT-PT Exam Syllabus Topics:

Topic Details
Topic 1
  • Common Failures in Performance Testing and Their Causes: This section of the exam measures the skills of Performance Engineers and outlines frequent failure modes, including slow responses at various load levels, degraded performance over time, and system crashes under peak conditions. It provides examples of underlying causes such as resource leaks, insufficient capacity, and poor handling of spikes or concurrency, illustrating why robust planning and monitoring are crucial for reliable performance.
Topic 2
  • The Concept of Load Generation: This section of the exam measures the skills of Software Test Analysts and discusses how representative loads are modeled and produced to simulate user or process behavior. It explores methods such as user interface inputs, crowdsourcing, API-based calls, or protocol capture and playback, emphasizing the need for repeatable loads that accurately reflect real-world conditions.
Topic 3
  • Types of Performance Testing: This section of the exam measures the skills of Software Test Analysts and covers various approaches such as load, stress, scalability, spike, endurance, concurrency, and capacity testing. It explains how each type evaluates system behavior under different conditions, helping testers and stakeholders understand how the system handles both expected and extreme usage scenarios.
Topic 4
  • Testing Types in Performance Testing: This section of the exam introduces the distinction between static and dynamic performance testing. It shows how reviews of requirements, architecture, and code can identify risks before coding is complete, and how runtime checks of resource utilization and response times reveal issues that only appear when the system is in operation.

 

NO.22 Which of the following is an advantage of using performance monitoring tools?

 
 
 
 

NO.23 What is the primary purpose of a load generator?

 
 
 
 

NO.24 Which of the following is a static performance test?

 
 
 
 

NO.25 Which of the following is a typical performance risk associated with mainframe architectures?

 
 
 
 

NO.26 How does a load management console aid performance testing?

 
 
 
 

NO.27 You are managing a project that is testing a system that manages a newly redesigned jet engine for heavy aircraft. Given the fact that this engine is specifically engineered to reduce noise, it is important that the software maintains enough thrust for lift for a period of 5 minutes without exceeding 87.5dB. The software must achieve this independent of other internal systems such as fuel or navigation management.
Given the risk for the ability of the aircraft to meet the noise abatement regulations while still being able to fly, when is the optimum time in the software lifecycle to apply the performance testing?

 
 
 
 

NO.28 At what point during performance testing does monitoring with the load testing tool begin?

 
 
 
 

NO.29 Which of the following can provide measurements for both individual and aggregated elements within a single performance test?

 
 
 
 

NO.30 Which type of performance test measures the system’s ability to handle increasing levels of load?

 
 
 
 

NO.31 During performance testing, in addition to the transaction response time, which of the following is needed to accurately reflect the total time to complete a transaction?

 
 
 
 

NO.32 Why is it important to specify how failures are handled during test execution?

 
 
 
 

NO.33 Which of the following performance script types measures network response times?

 
 
 
 

NO.34 You are managing the testing efforts of an existing distributed system that manages inventories of automobile and light truck tires from multiple warehouses across the country. The system is being enhanced to track incoming restocking shipments at the point of entry to the warehouse and outbound sales shipments at the point of shipment from the warehouse, all of which are executed in real-time. System loads traditionally peak on Mondays due to built-up demand from the previous weekend.
You are preparing a presentation to the business stakeholders, outlining your performance testing strategy.
Which of the following is appropriate to present to this audience?

 
 
 
 

NO.35 Which of the following should be a key part of your test acceptance criteria in your performance test plan?

 
 
 
 

NO.36 Which of the following is considered a characteristic of stress testing?

 
 
 
 

NO.37 Which of the following is a typical performance risk associated with distributed architectures?

 
 
 
 

NO.38 What challenge must be considered when using crowds to emulate load generation?

 
 
 
 

The New CT-PT 2025 Updated Verified Study Guides & Best Courses: https://www.dumpstorrent.com/CT-PT-exam-dumps-torrent.html

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.bandlab.com www.stes.tyc.edu.tw www.stes.tyc.edu.tw fortunetelleroracle.com

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below