2023 Updated SAP E-S4HCON2022 Certification Study Guide Pass E-S4HCON2022 Fast [Q20-Q42]

Rate this post

2023 Updated SAP E-S4HCON2022 Certification Study Guide Pass E-S4HCON2022 Fast

E-S4HCON2022 Dumps PDF 2023 Program Your Preparation EXAM SUCCESS

NO.20 Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

 
 
 
 

NO.21 Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

 
 
 
 

NO.22 In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

 
 
 
 

NO.23 What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

 
 
 
 

NO.24 ICNV initialization does 3

 
 
 
 

NO.25 You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

 
 
 
 

NO.26 Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

 
 
 
 

NO.27 During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status “automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

 
 
 
 

NO.28 What do you need to consider when performing the SI checks for an SAP S’4I 1ANA conversion? Note There are 2 correct answers to this question.

 
 
 
 

NO.29 You are planning to use DMO of SUM to perform an “inplace-migration” to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

 
 
 
 
 

NO.30 Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

 
 
 
 

NO.31 You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

 
 
 
 

NO.32 What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

 
 
 
 

NO.33 During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

 
 
 
 
 

NO.34 You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

 
 
 
 

NO.35 What can you achieve by setting the SUM parameter “migration_only” to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

 
 
 
 

NO.36 You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step “Configuration”. For some software components you find entries in the “Calculated level” column.
What does the “Calculated level” indicate for those software components?
Please choose the correct answer.
Response:

 
 
 
 

NO.37 What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

 
 
 
 

NO.38 Which additional configuration options are offered by SUM when selecting “Switch expert mode on” in main configuration option “Standard”?
There are 2 correct answers to this question.
Response:

 
 
 
 

NO.39 You are planning to use DMO of SUM to perform an “inplace-migration” to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

 
 
 
 
 

NO.40 You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

 
 
 
 

NO.41 You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

 
 
 
 

NO.42 You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

 
 
 
 
 

Get Perfect Results with Premium E-S4HCON2022 Dumps Updated 75 Questions: https://www.dumpstorrent.com/E-S4HCON2022-exam-dumps-torrent.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below