Check Real EDGE EDGE-Expert Exam Question for Free (2025) [Q36-Q57]

4/5 - (1 vote)

Check Real EDGE EDGE-Expert Exam Question for Free (2025)

Get Ready to Boost your Prepare for your EDGE-Expert Exam with 77 Questions

NEW QUESTION 36
Ceiling fans are an efficient way to increase air movement and therefore thermal comfort. Which of the following forms part of the evidence to demonstrate compliance at the design stage?

 
 
 
 

NEW QUESTION 37
Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

 
 
 
 

NEW QUESTION 38
An EDGE Auditor is auditing a hospital design for Preliminary Certification. The EDGE Client has included photovoltaics as one of the energy measures resulting in an overall 21% saving in energy. The Auditor observes the photovoltaics are facing the wrong direction. What action should the Auditor take?

 
 
 
 

NEW QUESTION 39
Which of the following heating systems uses Coefficient of Performance (COP) as a measure of efficiency in the EDGE software?

 
 
 
 

NEW QUESTION 40
Which of the following is an EDGE measure to reduce the embodied energy in materials?

 
 
 
 

NEW QUESTION 41
What does the EDGE Auditor provide in the EDGE certification process for a project they are auditing?

 
 
 
 

NEW QUESTION 42
What is the minimum percentage of efficient lightbulbs that must be installed to claim the measure EEM22 – Efficient Lighting for Internal Areas?

 
 
 
 

NEW QUESTION 43
Which of the following BEST describes an EDGE Expert?

 
 
 
 

NEW QUESTION 44
Is it possible to be both the EDGE Expert and Auditor on a project?

 
 
 
 

NEW QUESTION 45
Which of the following passive design features is considered within the EDGE calculation methodology?

 
 
 
 

NEW QUESTION 46
A hotel developer is planning a project. The specifications are based on corporate design standards for water fittings, lighting, heating, and air-conditioning. The EDGE Base Case will:

 
 
 
 

NEW QUESTION 47
A site audit must take place within how many months of the project’s practical completion date?

 
 
 
 

NEW QUESTION 48
Who is responsible for paying the EDGE certification fees?

 
 
 
 

NEW QUESTION 49
In EDGE software, occupancy sensors are used for controlling:

 
 
 
 

NEW QUESTION 50
An EDGE Auditor has been requested to provide auditing services to a development client. This particular client is well known as a hard negotiator and has offered the appointment on the basis of50% payment for assessment and 50% upon successful EDGE certification of the building. What should the EDGE Auditor do?

 
 
 
 

NEW QUESTION 51
Air-cooled chillers have the following components:

 
 
 
 

NEW QUESTION 52
In the EDGE software, what is the unit of the embodied carbon of the material?

 
 
 
 

NEW QUESTION 53
As an EDGE Auditor, one requires a full set of documentation to support each green building measure selected in a project assessment. Providing this information is the responsibility of:

 
 
 
 

NEW QUESTION 54
Coefficient of Performance (COP) of the electrical chiller is defined as:

 
 
 
 

NEW QUESTION 55
A medium-rise building comprises retail on the first two floors with offices on succeeding floors (third to fifth). If one of the tenants on the third floor aims for EDGE certification, which building type should be used?

 
 
 
 

NEW QUESTION 56
EDGE was created for new buildings to promote:

 
 
 
 

NEW QUESTION 57
Within the EDGE methodology, recycled water or rainwater harvested on site is deducted from the building’s Improved Case water consumption and is reported as:

 
 
 
 

Use Free EDGE-Expert Exam Questions that Stimulates Actual EXAM : https://www.dumpstorrent.com/EDGE-Expert-exam-dumps-torrent.html

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.flirtic.com

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below